Page 10 - TPM Issue3
P. 10

Below:
                                                                                      Fully loaded, the model with outriggers
                                                                                      and SSL system ready to roll.





























        outriggers swing out into a X pattern  structure  once  the  crane  cabin  has
        with   each   one   telescopically  been  repositioned  into  the  working
        extending  with  jacks  that  can  be  location. The ballast segments stack
        rotated  to  lower  them.  The  entire  neatly on the tray with 14 included in
        crane can be lifted from the ground  total, 7 for each side and the upper
        and the outriggers remain solid.  area  of  the  chassis  has  a  frame  to
           The main ballast plate incorporates  allow the base plate to sit centrally
        a  winch  which  is  pre-wound  and  to  allow  the  crane  to  self-ballast
        ready in case a jib for the model is  with chains included to allow this to
        released  at  a  later  date.  The  plate  be simulated. The boom has a pair of
        pins into place easily on the upper  hydraulic cylinders that can be locked

























                                      Left:
                                      The detail is amazing no
                                      matter where you look,
                                      here the SSL system in
                                      the stored position on
                                      the telescopic boom.












        10 TPMMW Magazine - Spring 2020
   5   6   7   8   9   10   11   12   13   14   15